Clients


Lowell Group Leeds
1250a Kva Standby diesel generator installation
This involved the removal of the existing generator set from its location in an underground basement, modifications and extension to the generator room, installation of new exhaust flue system and the diversion and upgrade of the power supply cables for the new generator. As part of the project Cube supplied and installed a mobile generator set, which was connected to the clients electrical equipment to ensure that in the event of a power failure over the 4 weeks of the project, the client would be provided with emergency standby power.

University of Leeds
Electrical Engineering Switchboard replacement
Through vigorous investigation, exploratory works and liaison with many university departments, Cube were able to successfully transfer all power supply circuits to the new switchgear with no unplanned power outages.
Working with clients nominated switchboard manufacturer, the project was successfully completed in 8 weeks with the outage periods limited to a week for each of the 2 main switch board sections. Cube has since been appointed to replace similar switchgear for a project in the ISS Building.